RP 110 kV Zharkov is well known to our specialists.
We work closely with our partners at the facility and talked about it earlier here.
As part of the contract with PJSC Nizhnekamskneftekhim, which is part of PJSC SIBUR Holding, in the period from September 2024 to February 2025, the specialists of LLC Power System Group carried out work on the first preventive control «K1» of RPA devices and electrical equipment at the RP 110 kV Zharkov distribution substation for 24 110 kV cells..
Within the scope of the contract, work was carried out on the first preventive control «K1» for the following equipment:
— RPA cabinets based on Siprotec 5 microprocessor terminals;
— electrical equipment — 110kV current transformers, 110kV voltage transformers, 110kV circuit breaker and disconnector drives, cabinets SHZV, SHZR, SHZTN, SHZST, SHSP, SHUR, SHUR TN;
— secondary switching circuits.