110 KV Volkovsky MPP substation

110 KV Volkovsky MPP substation

110 kV Volkovsky GOK substation.

We carry out commissioning work on: 110 kV RPA, 110 kV ORU power equipment, power transformers and reactors, SHSN and SOPT, 6 kV CRU electrical equipment, 6 kV CRU, automated control system, AIISKUE (Automatic Information Measuring System for Commercial electricity metering), lighting and welding networks.

110 kV Volkovsky GOK substation will provide power supply to the mining and processing plant facilities.

The Volkovskoye deposit of copper-iron-vanadium ores is located in the Sverdlovsk region in the territory of the Kushvinsky urban district, 30 km north of Nizhny Tagil.
The Volkovsky mine has been a part of JSC Svyatogor since 1999 and is its production division. The deposit is an arched elongated ore zone with a length of 3.5 km and a width of 1 km. The reserves of copper at the site are 772.7 thousand tons, iron – 20.074 million tons, vanadium oxide – 333.2 thousand tons.

Мы используем файлы cookie, для обеспечения лучшей работы сайта. Просматривая наш веб-сайт, вы соглашаетесь на использование файлов cookie.