In 2017, the second stage of construction of the 110/20 kV Neva Guba substation was completed and the substation was put into operation. As part of the second phase of construction, Power System Group supplied relay protection and automation systems and automated process control systems built on equipment from Siemens AG. Shipment of the equipment was carried out to the address of the general contractor OOO Elektrostroy. Start-up and adjustment works of the RPA and APCS complexes were carried out by PSG specialists from May to October 2017.
Neva Guba St. Petersburg Electric Networks
19.11.2020
- Home
- Track record
- Neva Guba St. Petersburg Electric Networks